PROJECT NAME:
PROJECT NAME:
Objective:
Strong green motivations and also to negate electricity bills.
Was very keen to incorporate the system design into the home. Actively involved throughout planning, and this provided an excellent integrated result.
Load Analysis:
14.2-17.5kWh average daily winter/summer demand; 5,2kW design surge
Site Considerations:
Custom built equipment room, and large optimised solar roof area
System Design:
After running their Murray Cod Aquaculture operation from expensive diesel generators for years, Coobool Downs wanted an alternative.
A huge effort by our team to salvage this system and provide a safe and working off-grid system for the Farrowing Property.
An off-grid system was required to replace the existing diesel generating plant, to offset diesel costs.