PROJECT NAME:
PROJECT NAME:
Objective:
The customer had an old off grid system that needed replacing.
Site Considerations:
The customer would be removing the old off grid system, including the old panels and wind turbine, to make way for the new system. We would need to fit a new solar array to the existing ground mounted frames as well as adding a new ground mounted solar array.
Load Analysis:
Average summer demand: 23.88kWh
Average winter demand: 17.53kWh
Demand surge: 9.39kW
System Design: