PROJECT NAME:
PROJECT NAME:
Objective:
Customer wanted this investment property to have the latest technology, a level of energy self-sufficiency and control over energy costs.
Load Analysis:
50kWh average daily summer/winter demand; large potential peak loads
Site Considerations:
3-phase grid power; 3 storeys
System Design:
After running their Murray Cod Aquaculture operation from expensive diesel generators for years, Coobool Downs wanted an alternative.
A huge effort by our team to salvage this system and provide a safe and working off-grid system for the Farrowing Property.
An off-grid system was required to replace the existing diesel generating plant, to offset diesel costs.