PROJECT NAME:
PROJECT NAME:
Objective:
Customer wanted this investment property to have the latest technology, a level of energy self-sufficiency and control over energy costs.
Load Analysis:
50kWh average daily summer/winter demand; large potential peak loads
Site Considerations:
3-phase grid power; 3 storeys
System Design:
Off-Grid Energy Australia · Securing your power and your future
Electrical Contractor Licenses: VIC REC-31913, TAS 15608294, WA EC15901, SA PGE278927, NSW 279181C