PROJECT NAME:
PROJECT NAME:
Objective:
High cost of connection for grid power, and a preference towards sustainable energy
Load Analysis:
15.3-19.6kWh average daily winter/summer demand; 6kW design surge
Site Considerations:
Optimal solar roof area and equipment room being built in preparation
System Design:
6KVA backup generator (autostart)
After running their Murray Cod Aquaculture operation from expensive diesel generators for years, Coobool Downs wanted an alternative.
A huge effort by our team to salvage this system and provide a safe and working off-grid system for the Farrowing Property.
An off-grid system was required to replace the existing diesel generating plant, to offset diesel costs.