PROJECT NAME:
Objective:
High cost of connection for grid power, and a preference towards sustainable energy
Load Analysis:
15.3-19.6kWh average daily winter/summer demand; 6kW design surge
Site Considerations:
Optimal solar roof area and equipment room being built in preparation
System Design:
6KVA backup generator (autostart)
Electrical Contractor Licenses: VIC REC-31913, TAS 15608294, WA EC15901, SA PGE278927, NSW 279181C
We acknowledge the Traditional Owners of Country throughout Australia and recognise their continuing connection to land, waters and culture. We would like to specifically acknowledge the Kaurna, Wathaurong, Wonnarua, Wiradjuri and Boonwurrung people. We pay our respects to their Elders past, present and emerging.