PROJECT NAME:
PROJECT NAME:
Objective:
Customers moving to existing country off-grid home with insufficient existing standalone power system
Load Analysis:
15.6-16.7kWh average daily winter/summer demand; 7.2kW design surge
Site Considerations:
Only east 2nd storey roof exposed; No shed or equipment room available
System Design:
A huge effort by our team to salvage this system and provide a safe and working off-grid system for the Farrowing Property.
An off-grid system was required to replace the existing diesel generating plant, to offset diesel costs.
Wellness Retreat Centre looking for electricity security and power reliability.
Off-Grid Energy Australia · Securing your power and your future
Electrical Contractor Licenses: VIC REC-31913, TAS 15608294, WA EC15901, SA PGE278927, NSW 279181C